EPC Projects by Dolphin Group
Service

EPC Projects

EPC heat exchanger projects in the UAE: engineering, procurement, construction and commissioning of complete thermal systems, delivered under single-point responsibility from one Abu Dhabi facility.

Scroll Down
How a epc projects works

How It Works

Each phase is delivered by the same organisation, so the information developed in one phase carries into the next without a commercial handover in between.

  1. 1

    Engineering establishes process and thermal design, equipment sizing, 3D modelling and code calculations in HTRI, PV Elite and ANSYS.

  2. 2

    Procurement sources materials with full material traceability, managing expediting and vendors through established supply chains.

  3. 3

    Construction covers manufacturing at our Mussafah facility and site installation by directly employed, ADNOC-inducted crews.

  4. 4

    Commissioning runs pre-commissioning checks and performance testing against the design duty, with documented handover.

Built to
Solve

Engineered against the specific failures that cost operators downtime, contamination or wasted energy.

Asset protection

Split contracts leave the interfaces unowned. When a package underperforms, the designer, the fabricator and the installer can each demonstrate compliance with their own scope while the system still fails to meet duty.

Process integrity

Thermal systems only work as systems. Equipment procured separately against individual datasheets frequently meets every specification and still fails to deliver the combined performance the process needs.

Operational efficiency

Managing several contractors across engineering, supply and construction consumes client project management effort that is rarely costed, and the schedule risk sits in the handovers between them.

Why Dolphin Group for
EPC Projects

Manufacturer-led EPC

Most of the equipment in our packages is built by us, so schedule and quality are controlled directly rather than managed through a supply chain.

ADNOC-approved and Local+ certified

Approved vendor standing and in-country value that scores directly on operator and EPC tenders.

Forty years of operating feedback

Designs reflect what we have seen survive in Gulf service, because we maintain the equipment long after handover.

Key
Benefits

What sets epc projects from Dolphin Group apart, in specific and measurable terms.

  • 1

    Single-point responsibility

    One contract covering engineering through commissioning, so system performance is owned by one party.

  • 2

    No interface gaps

    Design, manufacturing and installation in one organisation, removing the handovers where schedule and quality usually slip.

  • 3

    In-house manufacturing capacity

    ASME U2 manufacturing at Mussafah rather than subcontracted, which keeps schedule control in our hands.

  • 4

    Traceable procurement

    Material sourcing with full material certification and managed expediting.

  • 5

    Directly employed site crews

    ADNOC-inducted crews on our own books, not agency labour assembled per project.

  • 6

    Support beyond handover

    The team that built the system maintains it, under long-term service agreements where required.

Technical
Specifications

Design codes, materials and testing scope confirmed for every epc projects order.

Phases

Engineering · procurement · construction · commissioning · maintenance

Engineering software

HTRI · PV Elite · ANSYS · 3D modelling

Codes

ASME U2 Section VIII Div.1 · ASME U2 Section IX · TEMA · API

Manufacturing

ASME U2 stamped, at our Mussafah facility

Traceability

Full material certification throughout

Where It's
Used

EPC Projects in service, sector by sector, application by application.

Oil & Gas: EPC Projects applications

Oil & Gas

Heat exchangers for oil and gas in the UAE: thermal equipment engineered for upstream, midstream and refining service, built and serviced in Abu Dhabi.

View Sector
Petrochemicals: EPC Projects applications

Petrochemicals

Heat exchangers for petrochemical plants in the UAE: we build exchangers and reboilers for crackers, polymer plants and aromatics complexes worldwide.

View Sector
Power & Energy: EPC Projects applications

Power & Energy

Heat exchangers for power plants in the UAE: HEI-standard condensers, coolers and heat recovery equipment for conventional and renewable generation.

View Sector
Water & Desalination: EPC Projects applications

Water & Desalination

Desalination plant heat exchangers from the UAE: we build high-alloy heat exchange equipment for MSF, MED and RO desalination plants.

View Sector
Steel & Metallurgy: EPC Projects applications

Steel & Metallurgy

Steel plant heat exchangers and cooling equipment: furnace cooling, quench systems and dust-laden gas coolers built for the hardest environments in industry.

View Sector
Marine & Offshore: EPC Projects applications

Marine & Offshore

Marine heat exchangers built in Abu Dhabi: compact, seawater-tolerant cooling systems for vessels, rigs and offshore platforms.

View Sector

Frequently Asked Questions

Engineering, Procurement and Construction delivered under one contract, extended here to include commissioning and long-term maintenance. One party is responsible for the finished system meeting its duty, rather than several each responsible for a part.

Because the interfaces are where projects fail. Under split contracts each party can meet its own scope while the system still underperforms, and resolving that costs time nobody has allowed for.

The core thermal equipment is built at our own ASME U2 facility in Mussafah. That is the main reason we can hold schedule commitments rather than pass on a supplier delay.

Yes. We frequently deliver the specialist thermal scope turnkey while a main contractor handles the wider facility, and we work within their project systems.

Yes, and they hold ADNOC inductions and the relevant certifications. Directly employed crews are the difference between consistent site quality and variable agency labour.

Through pre-commissioning checks and performance testing against the design duty, documented as part of the handover package.

Yes, under long-term service agreements including condition monitoring and turnaround support. Having the builder maintain the system removes the learning curve.

Contact us with your scope, process data and schedule constraints. We will confirm battery limits and what is required to develop a proposal.

Talk to an Engineer About EPC Projects

Send your duty requirements or existing datasheet, and our engineers will confirm the right configuration.

Talk to an Engineer