Turnaround & Shutdown Support by Dolphin Group
Service

Turnaround & Shutdown Support

Multi-unit exchanger scopes executed inside turnaround windows — planned, mobilised and delivered by one accountable contractor.

Scroll Down

Why This
Matters

The wrong specification here doesn't show up on day one — it shows up as downtime, contamination or wasted energy later.

Asset protection

Turnarounds are when hidden exchanger damage is found — without workshop backup and materials on standby, discoveries become extensions, and every extension day is scoped, costed and defended after the fact.

Process integrity

Rushed reassembly causes the leaks that force early shutdowns; disciplined bolting and testing protect the next run length far more than schedule compression during the final days of a turnaround.

Operational efficiency

Every day of turnaround overrun costs more than the entire exchanger scope — planning and parallel execution are the insurance against a single bottleneck package delaying unit restart.

How a turnaround & shutdown support works

How It Works

Turnaround exchanger scope succeeds or fails before the plant comes down. Our model front-loads planning and holds workshop capacity in reserve for discoveries.

  1. 1

    Pre-TA survey: scope walkdown, historical data review, and per-unit work packs months ahead.

  2. 2

    Materials staged: gaskets, tubes, fasteners and spares procured and kitted per exchanger.

  3. 3

    Execution: parallel crews pull, clean, test and repair to the work packs with daily progress reporting.

  4. 4

    Discovery management: Mussafah workshop capacity on standby absorbs emergent repairs without extending the window.

  5. 5

    Reinstatement: controlled bolting, testing and documented handover unit by unit.

Configurations
We Offer

Every variant Dolphin builds — each engineered for a specific duty, not a catalogue default.

01

Full Exchanger Scope

Best For
Operators who want one accountable exchanger contractor.
Advantage
Single interface from planning to handover — no vendor coordination burden.
02

Specialist Support

Best For
TAs with an incumbent mechanical contractor.
Advantage
We deliver the specialist portion: cleaning, tube testing, retubing, code repair.
03

Emergency Reinforcement

Best For
TAs already in trouble.
Advantage
Crews and workshop capacity mobilised mid-window to recover schedule.

How to
Choose

CriterionGuidance
Scope definitionPer-unit work packs built from inspection history — not discovered at bundle pull.
Window durationCrew size and shift pattern engineered backwards from the critical path.
Discovery riskHigh-uncertainty units get pre-priced repair options and standby materials.
Site requirementsADNOC-inducted, HSE-certified crews with site-specific permits arranged ahead of mobilisation.

Key
Benefits

What sets turnaround & shutdown support from Dolphin apart, in specific and measurable terms.

  • 01

    Off the critical path

    Exchanger scope moved off the turnaround critical path.

  • 02

    Single accountable contractor

    Pulling through to reinstatement, start to finish.

  • 03

    Standby workshop capacity

    Absorbs discoveries without extending the schedule.

  • 04

    Pre-kitted materials

    Per exchanger, eliminating wait time on site.

  • 05

    Daily progress reporting

    Per-unit progress reported to TA management.

  • 06

    ADNOC-inducted crews

    A proven HSE track record on major sites.

Technical
Specifications

Design codes, materials and testing scope confirmed for every turnaround & shutdown support order.

Campaign scale5 – 100+ exchangers per turnaround
ServicesPull · clean · ECT/IRIS · repair · retube · reinstate
PlanningPre-TA surveys · work packs · materials kitting
BackupMussafah workshop standby · 24/7 operations
ReportingDaily progress · per-unit dossiers · close-out report

Why Dolphin for
Turnaround & Shutdown Support

Window discipline

A 34-exchanger scope delivered on schedule inside a 28-day window is our reference standard, not our exception.

Workshop as insurance

Emergent damage moves to Mussafah and back inside the window — capability no crew-only contractor can offer.

Operator compliance built in

Inductions, certifications and HSE systems aligned with ADNOC and major operator requirements.

Frequently Asked Questions

Ideally 4–6 months out: scope surveys, work packs and material procurement all happen before the window opens.

Crews scale to campaigns beyond 100 units, with parallel workfronts and workshop overflow at Mussafah.

Pre-priced repair options, standby materials and workshop capacity absorb discoveries — the answer is execution, not a change-order negotiation.

Yes — we integrate with your planning, permit and reporting systems, or run our own per-unit tracking for you.

Yes — inductions, certifications and HSE records maintained for major operator requirements.

Yes — shift patterns are built backwards from your critical path.

Yes — cleaning, tube testing, retubing and code repairs delivered as a specialist subcontract.

Contact us with your window dates and preliminary exchanger list — we begin with a scope survey and planning workshop.

Talk to an Engineer About Turnaround & Shutdown Support

Send your duty requirements or existing datasheet — our engineers will confirm the right configuration and get you a quote.

Talk to an Engineer